Steam Coil Air Heater Project – Two Biomass Plants
PPS Services Group provided detailed engineering and design, procurement support, and start-up and commissioning services for the installation of primary and secondary air heaters at (2) Biomass Plants to reduce potential condensate formation and corrosion.
A condensate collection system was also designed and procured to collect, flash, and pump condensate into the existing main condensate line supplying the existing deaerator.
On-site services were performed to verify routing and mitigate detected clashes in the 3D Model.