Diageo- Tusker Brewery Biomass Project – Kenya

circle-thick-red

East African Breweries Biomass Boiler

As part of Diageo’s corporate green-energy initiative, PPS Services Group provided detailed engineering and design to install a renewable biomass packaged boiler at Diageo’s Kisumu Facility.

The plant features a Hurst Boiler, and auxiliary equipment, a state-of-the-art AQCS (Air Quality Control System) as well as unique interface designs for steam, water, electrical, and controls.

The project is driven by Diageo’s corporate goals of substantially reducing their carbon footprint.