Falcondo International Gas Turbine FEED Study – Dominican Republic

circle-thick-red
Location:

Falcondo Bonao, Dominican Republic

2 x GE 7EA Combined Cycle 160 MW Repowering Project

PPS Services Group provided a Feasibility Study, Front End Engineering and Design Study (FEED), and condition assessment for two (2) GE 7EAs (with 2 Deltak HRSGs) in combined cycle with the two existing Falcondo steam turbines.

The Project included preliminary site plans, process flow diagrams, heat and mass balance, water balance, electrical one-lines, control system architecture, major equipment list, budget estimate, schedule, and division of responsibility.