Georgia Renewable Power Substation EPC Project

circle-thick-red

Electrical Interconnections

PPS Services Group provided a fast-track Engineering, Procurement, and Construction (EPC) contract to build two 13kV-115kV electrical interconnections at the 65MW Madison and Franklin Biomass Power Plant facilities.  The equipment included two SF6 circuit breakers, disconnect switches, a control house, dead end tower, and transmission line at each site.

PPS provided procurement and expediting services to meet an aggressive schedule for construction. An electrical contractor was subcontracted under our construction management team to install and commission the equipment.