Location:
Thompsons, TX
Braes Bayou 8 x LM6000
PPS Services Group provided the detailed design engineering as part of an EPC team with ProEnergy for a 400 MW simple cycle power plant utilizing eight General Electric LM6000 combustion turbine generators. Natural Gas is delivered to the site at conditions suitable for the CTG’s.
The Project included a 13.8kv to 345kv Substation using four (4) three-winding Generator Step-Up Transformers in parallel. The substation will interconnect with Centerpoint Energy.