ProEnergy HO Clarke Gas Turbine Peaking Plant – Texas

circle-thick-red

HO Clarke 2 x LM6000 Addition

PPS Services Group provided the detailed  design engineering as part of an EPC team with  ProEnergy for the addition of two General Electric  LM6000 combustion turbine generators. The plant  will be used as a peaking plant to supplement the  wind and solar power production.

The Project included a 138kv Electrical Switchyard  with two (2) dead-end towers which tie-in to the  existing substation. The Project is a fast-track  project, being engineered, procured, and  constructed in less than 6 months to meet summer  peak demands.