ProEnergy La Paz LNG gas Turbine Plant – Mexico

circle-thick-red

La Paz LNG Terminal Power Plant

PPS Services Group provided the detailed  design engineering as part of an EPC team with  ProEnergy for a 150 MW simple cycle power plant  utilizing three General Electric LM6000 combustion  turbine generators. The Power Plant will use  gasified liquid natural gas to produce electric  power for the La Paz LNG Terminal owned by New  Fortress Energy.

The Project included a 2 MW black start diesel  generator to provide electrical power to the LNG  compressors and a combustion turbine generator  to start the plant without requiring back feed from  the utility.