ProEnergy Mark One Gas Turbine Peaking Project- Texas

circle-thick-red

Mark One Generating Station (Phase 2)
4 x LM6000 Installation

PPS Services Group is providing the detailed  design engineering as part of an EPC team with  ProEnergy for the installation of four General Electric  LM6000 combustion turbine generators. The plant  will be used as a peaking plant to supplement the  wind and solar power production.

The Project includes a 138kv Electrical Switchyard  which ties-in to the  existing substation via an underground 138kV power feed.